Stop Spending $80,000 to $200,000 a Year on Walls You Throw Away.
Construction Sites
Every general contractor running five or more projects a year has done the math and ignored it. Temporary drywall barriers are in the bid. They are familiar. And every single one ends up in a dumpster at project close, while you budget the same line item for the next job. On an average GC portfolio, that is $80,000 to $200,000 in annual waste. Modwalls install in hours, reuse across 100 or more projects, and require no skilled trades. Your first purchase is the last time you pay for temporary barriers.
No commitment. Receive pricing and ROI estimate within 1 business day.
$80K-$200K
Avg Annual GC Drywall Barrier Waste
2-3
Projects to Full Payback
100+
Reuses Per Panel Set
Hours
Install Time vs Days for Drywall
THE HIDDEN COST OF THROWAWAY WALLS
The Real Cost of Disposable Barriers Is Not on the Bid Sheet.
The drywall barrier line item looks cheap on the bid. It is not cheap when you run the annual total. It is not cheap when your drywall crew does not show, and your project timeline slips by three days. It is not cheap when your GC-subcontractor relationship takes the hit because the schedule slipped, and the general superintendent is on the phone wanting to know why a temporary wall cost you a week. The actual cost of drywall barriers is the material, the labor, the waste disposal, the rescheduling when trades are unavailable, and the full rebuild cost on the next project. Then the project was after that. Modwalls GCs pay for the system once and run it across their entire project portfolio for years.
Single-Use Waste Eats Project Margin
Temporary drywall is a consumable material with no residual value. Every panel you build, and tear down is a cost with zero recovery. Modwalls panels are capital assets that retain and deliver value across 100 or more project deployments.
Skilled Trade Dependency and Scheduling
Drywall subcontractors are harder to schedule and more expensive every year. When your crew does not show, your timeline slips and your GC relationship takes the damage. Modwalls install with general labor - on your schedule, not your sub's.
OSHA Dust Control and Compliance
Construction dust control is not optional on occupied sites. A non-compliant barrier is an OSHA citation and a project to halt. Modwalls panels are sealed, debris-free, and shipped with OSHA compliance documentation for occupied-site applications.
Idle Time and Project Timeline Risk
Every extra installation day is a cost. Drywall installation creates a scheduling dependency that does not exist with Modwalls. A small general labor team deploys the complete system in a single shift - and takes it down just as fast at project close.
YOUR FAST-TRACK FROM QUOTE TO INSTALL
From Quote to Installed Barrier in Days, Not Weeks.
1
Quote and ROI Review
Submit your project scope and annual barriers. We return a detailed pricing proposal, deployment timeline, and ROI calculation showing your payback point within 1 business day.
Day 1
2
Manufacturing and Delivery
Panels are factory-cut to your specifications and shipped to your project site on your timeline. No waiting on a subcontractor's crew availability.
Day 2-15
3
Installation
General labor installs the complete system in a single shift. Your project continues schedule.
Same Day
THE MODWALLS GC ADVANTAGE
Six Reasons High-Volume GCs Choose Modwalls Over Drywall.
Install in Hours, No Skilled Trades
A general labor team with basic hand tools installs the complete system in a single shift. No drywall license. No specialty equipment. No sub scheduling that controls your timeline.
Reuse Across 100 or More Projects
Every panel reconfigures, moves, and reinstalls. Buy the system once and run it across your entire project portfolio for years. The math gets clearer every time you redeploy.
OSHA Compliant Dust Control
Sealed panels. Zero construction of debris. Full OSHA compliance documentation for occupied-site applications. No citation risk. No project halt.
Rent or Buy, Your Choice
Rent for a single project to validate the system. Buy when the math makes it obvious, which is usually after projecting two or three. We show you both scenarios with your numbers before you decide.
Zero Landfill, LEED Conscious
No drywall debris. No waste of disposal costs. No landfills. For GCs working on LEED projects or with sustainability-conscious owners, the compliance story builds itself.
American-Made Since 1989
Allied Modular has manufactured in the United States for over 35 years. Not a re-branded import product. Full domestic manufacturing documentation available for Buy American projects.
START YOUR JOBSITE BARRIER TODAY
Get Your Free Modwalls Quote Now
Fill out the form and receive a detailed pricing proposal, deployment timeline, and full documentation package within 1 business day. No sales pressure. No commitment is required.
- OSHA dust control compliance documentation
- Factory-cut panels to your project specifications
- ROI analysis comparing Modwalls to your current annual barrier spend
- Installation guide for general labor crews
- Allied Modular limited warranty
Included with every order
REUSABLE
FULLY DOCUMENTED
READY TO INSTALL
SEE MODWALLS IN THE FIELD
Projects Gallery
See how organizations across healthcare, construction, airports, and trailer fleets are using Modwalls.
WHAT General Contractors ASK FIRST
The 5 Questions Every General Contractor Asks Before Choosing Modwalls.
Is Modwalls certified for ICRA Class III and IV?
Yes. Our systems are engineered and fully documented for ICRA Class II, III, and IV requirements. Every order ship with a pre-written compliance documentation package that your infection control officer and Joint Commission surveyor can review. We have been specified by name in healthcare facility RFPs because the documentation trail is reliable.
Can you install without shutting down the adjacent patient care area?
That is exactly how Modwalls was designed to deploy. Our systems are installed with general labor during off-hours. No heavy equipment. No construction debris. No disruption to occupied patient care areas. The floor next door never knew construction happened.
What happens when we need a barrier for a different project?
You take it down, transport it, and reinstall it. The panels are designed for exactly that. Allied Modular has customers using the same panels across more than 100 separate hospital projects. You buy the system once, and it becomes a capital asset that serves your facility for years.
How does the cost compare to drywall for a typical hospital renovation?
On a single project, drywall may appear less expensive on the initial bid. But facilities directors who manage multi-year renovation programs spend $80,000 to $200,000 annually on disposable drywall barriers. Modwalls systems pay for themselves within 2 to 3 projects. We will run the numbers specific to your facility before you make any decisions.
What documentation do you provide for our compliance file?
Every Modwalls healthcare order includes: ICRA class certification, materials documentation with wipe-clean surface verification, installation verification documentation, and the Allied Modular limited warranty. Everything your infection control officer, accreditation surveyor, and risk management team will ask for - delivered before the installation date.
Still Have Questions? Call
1-888-836-7850More Applications
Modwalls Works Across Every High-Stakes Environment.
YOUR LAST THROWAWAY BARRIER
Stop Rebuilding the Same Barrier on Every Project.
Request pricing, a deployment timeline, and a full ROI calculation for your project portfolio. Most GCs recover their investment within 2 to 3 projects.





