The ICRA Barrier System Built for Hospitals That Cannot Afford a Compliance Failure.

HEALTHCARE

Active healthcare renovation is a minefield. One failed ICRA inspection. One contamination event. One Joint Commission citation. The liability does not end with the project, it follows your facility for years. Modwalls delivers fully documented ICRA Class II, III, and IV barrier systems that install overnight, require zero skilled trades, and arrive with every compliance document your infection control team needs. Your next renovation does not have to be a risk event.

No commitment. Receive pricing + deployment timeline within 1 business day.

ICRA II-IV

All Class Levels Supported

Overnight

Deploy Without Shutting Down

100%

Documentation for Compliance File

35+

Years Manufacturing in America Since 1989

The hidden cost of drywall barriers

Every Drywall Barrier You Build in an Active Hospital Is a Documented Liability.

Temporary drywall construction barriers look like a cost-effective solution until the infection control team walks off the floor. Seams that do not seal. Materials that cannot be wiped clean with hospital-grade disinfectants. Installation crews that require access during occupied hours. Documentation that does not exist when the Joint Commission asks for it. Healthcare facilities directors who have managed a regulatory citation know the real cost. It is not fine. It is the corrective action plan, the retrained staff, the follow-up audit, and the reputational exposure with your accreditation body. Modwalls eliminate every one of those failure points before the first panel goes up.

ICRA Non-Compliance Risk

A drywall barrier built to the wrong class specification is a violation of the moment construction begins. Modwalls panels are engineered and documented to ICRA Class II, III, and IV requirements - with the paperwork your infection control officer signs off on before the crew arrives on site.

Vendor Accountability Gap

When an ICRA failure occurs, your facility needs a vendor with documented systems, not a drywall subcontractor with no compliance paper trail. Allied Modular provides complete project documentation - materials, installation verification, and ICRA class certification - on every order.

Active Operations Cannot Stop

Patient care continues on the other side of your barrier. Overnight installation is not a premium - it is a requirement. Modwalls deploys during off-hours with general labor, and the occupied floor never knows construction happened.

Repeated Single-Use Costs

Every temporary drywall barrier built in your facility ends in a dumpster. You are funding that cost on every project. Modwalls panels reconfigure and reinstall across 100 or more projects. Your first purchase is the last time you pay for ICRA barriers.

Your fast-track to compliance

From Quote to Compliant ICRA Barrier in Days, Not Weeks

1

Quote and Compliance Review

Submit your floor plan and ICRA class requirement. We return a detailed pricing proposal, deployment timeline, and pre-written compliance documentation within 1 business day.

Day 1

2

Manufacturing and Delivery

Panels are factory-cut to your ceiling height and space dimensions. Shipped directly to your facility on your project timeline. No waiting on a subcontractor schedule.

Day 2-15

3

Installation

A general labor team installs the complete barrier system in a single shift. No drywall license. No specialty equipment. No construction debris is left in your patient care area.

Same Day

THE MODWALLS ADVANTAGE

Six Reasons Healthcare Facilities Directors Choose Modwalls Over Drywall

ICRA Class II, III, and IV Ready

Engineered and documented for every class of healthcare construction. Your compliance file is complete before the first panel is installed.

Overnight Deployment — No Patient Disruption

General labor installs the complete system during off-hours. Occupied patient care areas are never exposed to the construction process.

Full Documentation Package Included

ICRA class verification, materials documentation, and installation sign-off delivered with every order. Your infection control team has everything needed for the compliance file.

Reusable Across 100 or More Projects

Panels reconfigure, move, and reinstall. Your facility buys the system once and never funds another ICRA barrier to purchase.

No Skilled Trade Dependency

Standard drywall crews are harder to schedule and more expensive every year. Modwalls install with general labor and basic hand tools on your timeline, not your subcontractor's.

American-Made Since 1989

Allied Modular has been manufacturing in the United States for over 35 years. Your procurement office has full domestic manufacturing documentation on request.

Get a Free ICRA Quote

START YOUR COMPLIANT BARRIER TODAY

Get Your Free Modwalls ICRA Quote Now

Fill out the form and receive a detailed pricing proposal, deployment timeline, and full ICRA compliance documentation package within 1 business day. No sales pressure. No commitment is required.

  • ICRA Class II, III, and IV certification documentation
  • Factory-cut panels matched to your project floor plan
  • Wipe-clean surface. Hospital-grade disinfectant compatible
  • Installation guide for general labor crews
  • Allied Modular limited warranty

Included with every order

REUSABLE

FULLY DOCUMENTED

READY TO INSTALL

WHAT DIRECTORS WANT TO KNOW FIRST

The 5 Questions Every Healthcare Facilities Director Asks Before Choosing Modwalls.

Yes. Our systems are engineered and fully documented for ICRA Class II, III, and IV requirements. Every order ship with a pre-written compliance documentation package that your infection control officer and Joint Commission surveyor can review. We have been specified by name in healthcare facility RFPs because the documentation trail is reliable.

That is exactly how Modwalls was designed to deploy. Our systems are installed with general labor during off-hours. No heavy equipment. No construction debris. No disruption to occupied patient care areas. The floor next door never knew construction happened.

You take it down, transport it, and reinstall it. The panels are designed for exactly that. Allied Modular has customers using the same panels across more than 100 separate hospital projects. You buy the system once, and it becomes a capital asset that serves your facility for years.

On a single project, drywall may appear less expensive on the initial bid. But facilities directors who manage multi-year renovation programs spend $80,000 to $200,000 annually on disposable drywall barriers. Modwalls systems pay for themselves within 2 to 3 projects. We will run the numbers specific to your facility before you make any decisions.

Every Modwalls healthcare order includes: ICRA class certification, materials documentation with wipe-clean surface verification, installation verification documentation, and the Allied Modular limited warranty. Everything your infection control officer, accreditation surveyor, and risk management team will ask for - delivered before the installation date.

Still Have Questions? Call

1-888-836-7850

BEYOND THE HOSPITAL FLOOR

Modwalls Works Across Every High-Stakes Environment.

Healthcare

Healthcare

ICRA Class II-IV - Infection Control - Overnight Deploy

Explore More
Mobile Office Customization

Mobile Office Customization

Custom Layouts - Reconfigure Per Client - Fast Quote

Explore More
Trailer Fleet Refurbishment

Trailer Fleet Refurbishment

Fast Turnaround - Reusable Interiors - Fleet ROI

Explore More

STOP THROWING MONEY IN THE DUMPSTER

Stop Paying for ICRA Barriers That End Up in a Dumpster After Every Project.

Request pricing, deployment timeline, and a full ICRA compliance documentation package for your next renovation. Most healthcare facilities recover their investment within 2 to 3 projects